Holdback: money held at closing until the work is done
A holdback is a portion of the purchase price or sale proceeds held in escrow at closing, and released after agreed work is completed. The clearest written rules come from Fannie Mae. Its Selling Guide says improvements, alterations and repairs must generally be complete when a loan is sold to Fannie Mae, and the postponed-improvement rules are the exception: the loan can close first, with funds held back until the work is done.
Fannie Mae's postponed-improvement rules
For new or proposed construction, the work postponed at closing must be finished within 180 days of the note date. The items must be part of the sales contract (third-party contracts are not permissible), postponed for a valid reason such as inclement weather or a shortage of building materials, and not affect the ability to obtain an occupancy permit. The cost to complete cannot exceed 10% of the "as completed" appraised value.
The lender then sets up a completion escrow by withholding from the purchase proceeds an amount equal to 120% of the estimated cost to finish. If the contractor or builder gives a guaranteed fixed-price contract for completion, the escrow only needs to equal the contract price. The escrow is a custodial account, and lender and borrower sign an escrow agreement stating how funds are managed and disbursed. Completion is confirmed on Form 1004D or an acceptable completion alternative.
Renovation loans differ: for HomeStyle Refresh loans on existing homes, the escrow covers the total improvement cost plus an optional contingency reserve of up to 20%, and leftover funds go to reduce the loan balance.
Worked example: a builder's sale with unfinished exterior work
An investor-builder sells a newly built house to an owner-occupant with a Fannie Mae conventional loan. Figures are assumed for illustration.
| Assumption | Value |
|---|---|
| As-completed appraised value | $350,000 |
| Postponed items | Sod and concrete driveway, delayed by rain |
| Estimated cost to complete | $9,000 |
| Alternative | Builder signs a guaranteed fixed-price contract for $9,000 |
- 10% test: 10% x $350,000 = $35,000. The $9,000 is under the cap, so the items can be postponed.
- Holdback without a fixed-price contract: 120% x $9,000 = $10,800 withheld from the proceeds at closing.
- Holdback with a guaranteed fixed-price contract: $9,000.
- Deadline: the work must be done within 180 days of the note date, confirmed on Form 1004D or an acceptable alternative.
The builder has $10,800 (or $9,000) of sale proceeds unavailable at closing. The final draw, including any excess over the cost of completion, is released after completion is confirmed. Plan for that much less cash until the 1004D comes back, and finish within 180 days.
Doing this in Deal Run
Deal Run is our product. On a flip or a rehab loan with draws, the holdback is sized from your repair number; its AI repair estimate from the property photos, plus a max offer for flip, rental and wholesale exits, gives you that number before you sign, so you know how much cash a completion escrow or draw would tie up.
Frequently asked questions
What is a holdback in real estate?
A portion of the purchase price or sale proceeds held in escrow at closing and released after agreed work is completed.
How much does Fannie Mae require to be held back?
For postponed improvements, the lender withholds 120% of the estimated cost to complete. With a guaranteed fixed-price contract from the contractor or builder, the escrow only needs to equal the contract price.
What is the limit on postponed work?
The cost of completing improvements cannot exceed 10% of the as-completed appraised value, and the work must be finished within 180 days of the note date on new or proposed construction.
How is completion confirmed?
With Form 1004D or an acceptable completion alternative.
What happens to leftover funds on a renovation loan?
On a Fannie Mae HomeStyle Refresh loan for an existing home, leftover escrow funds go to reduce the loan balance. The escrow can include an optional contingency reserve of up to 20%.
Sources
- Fannie Mae Selling Guide B4-1.2-05, Requirements for Verifying Completion and Postponed Improvements (12/10/2025), checked October 30, 2026